Crestchic Ltd

thumb_up 130 suka
phone
Klik untuk menampilkan telepon
Permintaan informasi

Crestchic Ltd Informasi Perusahaan

Informasi umum

1983 – Business established by Jim Gould, Ron Bancroft, David & Jonathan Gould in Burton on Trent, with the sole intention of designing, manufacturing and hiring AC & DC load banks.

1984 – First order from Littlewoods Group in Liverpool to provide four 100kW multi-voltage load banks for its various sites across Merseyside. Rental business starts to make good progress in the UK.

1985 – Crestchic Sales embarks on an epic sales tour from England to the Middle East showcasing a 100kW load bank to all along the way. A journey of over 4000 miles in an old Bedford van!

1986 – Major contract win with Stewart & Stevenson Houston Texas for seventeen 50kVA resistive-reactive load banks, as Crestchic go international!

1988 – Expansion to additional larger premises in Burton to cope with growing domestic rental and international sales & the first of many aviation ground power load banks is launched, with the first 400Hz unit sold to Glasgow Airport.

1989 - First 20ft ISO containerised load bank sold to Wimpy Major Projects Division for Faslane Naval base.

1995 – Jim Gould establishes a relationship with the Fong Brothers in Singapore for rental & sales; with an initial order for four 10ft containerised load banks.

1998 – Jim continues the international expansion with the appointment of Hawthorne Power Systems as our US agent.

1998 – Both manufacturing & rental operations move into a purpose built 22,000²ft premises at Centrum 100, Burton on Trent.

1999 – Sees the completion of Crestchic’s largest single order to date to the Ministry of Defence for The British Army; 137* Def-60 load banks with a contract value in excess of £1.5M.

2000 – Hyundai places an order for the first of many 20ft containerised resistive/reactive load banks for their Korean shipyard operations. Every other major Korean shipyard will follow with orders over the next 12 years.

2001 – Crestchic secures a MoD aircraft support team order for forty-five 120kVA 400Hz/2000Amps 28vDC combi load banks. This year also sees Crestchic start to package transformers at 2.9MVA & 5.8MVA to cope with increasing demands for multi-megawatt high voltage testing.

2002 – Crestchic manufacturer the first “Dynamic” Load banks for the Alstom Type 45 Destroyer Electric Ship project utilising packaged multi-voltage AC & DC load banks, alternators, AC motors and invertors.

2004 – Increasing rental demand in Germany sees the opening of Crestchic GmbH in Kassel, Germany

2006 – Business acquired by Northbridge Industrial Services Plc.

2011 – Further expansion in Continental Europe with the establishment of Crestchic France in Paris.

2012 – New 2400m² rental facility opened in Burton to serve UK and International rental markets.

2013 – Crestchic celebrates it’s 30th anniversary.

2013 - Crestchic Founder and MD, Jim Gould sadly dies.

2014 - Crestchic globally unifies as one brand. Rebranding as Crestchic in the Middle East & APAC with a new company wide logo following the acquisition of long term distributor Crestchic Asia Pacific in Singapore.

2015 - Crestchic unveils its latest addition to the product range - a Capacitive load bank, which operates at a leading power factor.

2015 - Crestchic introduces a dedicated service and parts team at its Burton Headquarters.

Burton-on-Trent

Jam buka
Senin:
08:30 - 17:30
Selasa:
08:30 - 17:30
Rabu:
08:30 - 17:30
Kamis:
08:30 - 17:30
Jumat:
08:30 - 17:30
Nomor telepon
+441283531645
Tautan ke
Akun Sosial

Crestchic Ltd Ulasan & Peringkat

Bagaimana Anda menilai perusahaan ini?

Apakah Anda pemilik perusahaan ini? Jika ya, jangan lewatkan kesempatan untuk memperbarui profil perusahaan Anda, menambahkan produk, penawaran, dan posisi yang lebih tinggi di mesin pencari.

Halaman serupa untuk bisnis Anda? Pastikan semua orang dapat menemukan Anda dan penawaran Anda. Buat halaman khusus perusahaan Anda di Yoys - sederhana dan mudah!
Tambahkan perusahaan Anda